Building facts
- Address
- 18555 Collins Avenue
- Neighborhood
- Sunny Isles Beach
- Year built
- 2017
- Floors
- 57
- Residences
- 132
- Status
- Completed
- Developer
- Dezer Development
- Architect
- Sieger Suarez Architects
- Pricing
- Starting at $4.3 Million
Porsche Design Tower is 641 feet and 60 storeys of oceanfront Sunny Isles containing just 132 residences — and three vehicle elevators that carry owners up in their cars and deposit them in a private garage beside their own front door. Completed in January 2017 at a construction cost of roughly $560 million, it is the most-discussed condominium in South Florida, for two very different reasons.
One of them is the car lift. The other is a University of Miami study. Both belong on this page.
- 641 feet (195 m), 60 storeys, oceanfront Sunny Isles Beach
- 132 residences — an exceptionally low unit count for the height
- Architect: Sieger Suarez Architects
- Groundbreaking 19 April 2014; completed January 2017
- Construction cost approximately $560 million
- Three vehicle elevators serving 284 parking spaces for 132 units
- Reported unit values ranging $4 million to $32.5 million
The car elevator, and the question nobody asks about it
How the car elevator works
The system is genuinely unlike anything else in residential construction. Three elevators are built to carry vehicles. Drivers stay in the car, ride up, and the vehicle is placed into a private garage adjacent to the residence. With 284 spaces across 132 units, most owners can keep two vehicles beside their living room, and some four.
As an idea it is close to perfect for its buyer: no valet, no garage level, no walk, and the cars are visible from inside the apartment. It is the single most effective piece of product design in the Sunny Isles market and it is why the building holds its identity a decade on.
The question nobody asks about it
Here is what no brochure discusses, and what any buyer should establish before offering.
A proprietary vertical vehicle transport system is a long-lived, high-consequence mechanical asset with no off-the-shelf replacement. Three lifts serve 132 households. The questions that follow are entirely practical:
- What does the reserve study assume for the vehicle elevators — servicing, component replacement, and eventual modernisation — and is that line funded?
- Who maintains them, under what contract, and what is the response time? A residential lift out of service is an inconvenience. A vehicle lift out of service means an owner cannot retrieve their car.
- What is the redundancy position? With three units serving the tower, what happens when one is down for scheduled work, and what is the contingency if two are?
- Is there an obsolescence plan? Bespoke systems installed in 2014–2017 will need major modernisation within the life of the building, and the cost is not comparable to a standard elevator programme.
None of this is a reason to avoid the building. It is the reason to read the reserve study line by line rather than skimming the amenity list — because in this tower, the amenity is the mechanical plant.
“Is Porsche Design Tower sinking?” — the straight answer
This is the question people actually type, so here is the honest version rather than either the scare headline or the silence.
What the research found
What the research found. University of Miami researchers used satellite radar interferometry to measure vertical movement in high-rise buildings along Miami-Dade’s barrier islands between 2016 and 2023. Thirty-five buildings showed measurable subsidence of 2 to 8 centimetres. Porsche Design Tower is among the buildings identified, and has been reported as having settled toward the upper end of that range — as much as eight centimetres. The causes given are inconsistent limestone layers and groundwater movement, with construction vibration accelerating the compaction of sandy layers.
What that actually means
What that actually means. Eight centimetres is about three inches, spread across seven years — roughly eleven millimetres a year, in a building that topped out in 2016 and completed in January 2017. A newly completed 641-foot tower consolidating into sandy layers over its first years is expected structural behaviour, not an anomaly. The researchers noted that subsidence in most high-rises slows over time.
The context that gets omitted
The context that is almost always omitted. The same University of Miami team ran the identical analysis over the Champlain Towers South site for the years before June 2021 and reported that “no displacement signals were detected before the collapse, indicating that settlement was not the cause of collapse.” The mechanism being measured here is not the mechanism that killed 98 people at Surfside. The researchers also declined to characterise any building in the study as unsafe.
What a buyer should do
What a buyer should do with this. Not panic, and not ignore it. Ask the association three things: whether it has commissioned its own elevation or settlement survey since December 2024, what that survey shows about rate (still moving, or decelerating), and what it shows about differential movement across the footprint. Uniform settlement is a utilities-and-finishes issue. Differential settlement is the one engineers care about, and satellite data cannot resolve it at the level an owner needs.
Our full analysis of the study — including which buildings it names, which it does not, and why the “next Surfside” framing is wrong — is in the full analysis of the subsidence research.
The milestone position
Under Florida Statute 553.899, a condominium building of three or more habitable storeys must complete a milestone structural inspection by 31 December of the year it turns 30, then every 10 years. The statute then does something most coverage misses: § 553.899(3)(b) lets the local enforcement agency shorten that clock, where local circumstances — expressly including “proximity to salt water” — warrant it.
Miami-Dade County has exercised that discretion. Coastal buildings of three or more storeys completed in 1998 or later are on the 25-year clock; other buildings from 1993 or later remain on 30. Sunny Isles Beach does not administer its own programme — it follows the county’s. So the 25-year figure that applies here is a county determination, not an automatic feature of the statute, and a determination can be revisited.
Porsche Design Tower received its temporary certificate of occupancy in November 2016, and county records carry the building as completed that year. That places the first milestone inspection around 2041. One caveat we will not paper over: a temporary certificate and a final certificate of occupancy can fall in different years, and no final CO date for this building is public. The certificate date is what legally controls, and it should be confirmed from the record before anyone relies on it.
That matters more than it sounds. The subsidence conversation has attached itself to a building that is, in regulatory terms, nowhere near its first structural inspection — while a great deal of the older Sunny Isles and Miami Beach stock is inside that cycle right now, discovering deferred maintenance and assessing for it. Those are very different risk profiles, and the coverage has flattened them into one.
- Any settlement or elevation survey commissioned by the association since December 2024 — and specifically what it says about rate and differential movement.
- The reserve study’s treatment of the vehicle elevator system, and whether that line is funded.
- The vehicle elevator maintenance contract — provider, scope, response time, and redundancy during servicing.
- The certificate of occupancy date, which fixes the milestone year.
- Three years of budgets and the assessment history — the trajectory, not this year’s number.
- The master insurance policy and its per-unit deductible. Above $50,000 per unit this breaks Fannie Mae eligibility outright.
- Twenty-four months of board minutes. Settlement, mechanical failures and engineer engagements appear in minutes long before they appear in reports.
Financing — where any of this reaches price
Since 3 August 2026, Fannie Mae’s Lender Letter LL-2026-03 has retired the Limited Review path for established condominium projects over ten units. Full Review now applies at every down-payment level, so the lender reads the milestone report, the reserve study, the budget and the master insurance policy. A per-unit deductible above $50,000 breaks eligibility, and from 4 January 2027 minimum reserves rise from 10% to 15% of annual budgeted assessment income.
In June 2026, 48.5% of Miami-Dade condominium sales closed in cash — meaning 51.5% needed a lender — in a county carrying 12.3 months of condominium supply with the median down 3.1% year over year. A project that fails Full Review becomes cash-only and loses roughly half its buyer pool.
That is the transmission mechanism. Not a satellite measurement — a document a lender reads.
The honest summary
Porsche Design Tower is a genuinely singular building: 132 residences in 60 storeys of oceanfront, with a vehicle delivery system that nobody has successfully copied, roughly sixteen years before its first milestone inspection.
It also carries a settlement finding at the top of the measured range, which a buyer will find in seconds and should raise rather than avoid. The finding is not evidence of danger, and the same research severs the Surfside comparison it gets paired with. What it justifies is a specific request to the association for building-level monitoring data — which is a reasonable thing to ask, and a very informative thing to be refused.
The under-discussed risk here is not the ground. It is the reserve position on three bespoke vehicle elevators serving 132 households. Underwrite that.
See also Sunny Isles Beach, Eighty Seven Park and the full our full Miami condo coverage market.
Related reading: Jade Signature further south on Collins · the Sunny Isles submarket · the most expensive homes in the county.
Porsche Design Tower — common questions
Is Porsche Design Tower sinking?
University of Miami satellite research measured 35 barrier-island buildings settling 2 to 8 centimetres between 2016 and 2023, and Porsche Design Tower has been reported at the upper end — as much as eight centimetres, roughly three inches over seven years. Critical context: the researchers did not declare any building unsafe, a newly completed 641-foot tower consolidating into sandy layers is expected behaviour, subsidence in most high-rises slows over time, and the same study found no displacement at all at Champlain Towers South before its collapse. Ask the association for any elevation survey commissioned since December 2024, and specifically what it shows about rate and differential movement.
How does the Porsche Design Tower car elevator work?
Three elevators are built to carry vehicles. The driver stays in the car, rides up, and the vehicle is placed into a private garage adjacent to the residence. There are 284 parking spaces for 132 units, so most owners can keep two cars beside their apartment and some four. Before buying, establish what the reserve study assumes for the system, who maintains it and with what response time, and what the redundancy position is when one of the three is out of service.
How many units are in Porsche Design Tower?
132 residences across 60 storeys and 641 feet, designed by Sieger Suarez Architects. Construction broke ground on 19 April 2014, completed in January 2017, and cost approximately $560 million. Reported unit values have ranged from $4 million to $32.5 million.
When is Porsche Design Tower’s milestone inspection due?
Florida Statute 553.899 sets the milestone structural inspection at 30 years for condominium buildings of three or more habitable storeys, then every 10 years. Section 553.899(3)(b) lets the local enforcement agency shorten that to 25 years where local circumstances such as proximity to salt water warrant it, and Miami-Dade County has done so for coastal buildings completed in 1998 or later. Sunny Isles Beach follows the county’s programme. Porsche Design Tower received its temporary certificate of occupancy in November 2016, which places the first milestone inspection around 2041. A temporary and a final certificate of occupancy can fall in different years, and the certificate date is what legally controls, so it should be confirmed from the record.
Did subsidence cause the Surfside collapse?
No. The University of Miami team analysed the Champlain Towers South site for the years preceding June 2021 and reported that “no displacement signals were detected before the collapse, indicating that settlement was not the cause of collapse.” This is the most important finding in the research and the one most consistently omitted from coverage that pairs subsidence with Surfside.
What is the biggest overlooked risk at Porsche Design Tower?
Arguably not the ground — the vehicle elevator system. It is a bespoke, high-consequence mechanical asset with no off-the-shelf replacement, three units serving 132 households, installed 2014–2017 and facing eventual modernisation at a cost not comparable to a standard elevator programme. Read the reserve study’s treatment of it line by line, and confirm the maintenance contract and redundancy arrangements.
Sources and further reading
- Porsche Design Tower (Sunny Isles Beach) — building recorden.wikipedia.org
- University of Miami Rosenstiel School — subsidence hotspots in South Floridanews.miami.edu
- University of Miami College of Engineering — subsidence hotspots in South Floridanews.miami.edu
- Florida Statute 553.899 — Mandatory structural inspectionsflsenate.gov
- Fannie Mae — Lender Letter LL-2026-03singlefamily.fanniemae.com
- MIAMI REALTORS — South Florida Market Stats, June 2026miamirealtors.com
Related coverage
Part of Miami Luxury Condos.


