Latest File · Brickell & Brickell KeyThree Towers, and Nobody Can Tell You How Many Homes Are in ThemThis file needs no developer’s cooperation and makes no accusation. It is three towers, three sets of numbers …Open the files →
Josh Stein, Miami real estate associateJosh Stein
Downtown Miami arena and skyline lit at night

E11even Residences Beyond Miami

Building facts

Address
20 NE 11th Street
Neighborhood
Downtown Miami
Year built
2026
Floors
65
Residences
461
Status
Pre-Construction
Developer
PMG & E11EVEN Partners
Architect
Sieger Suarez Architects
Pricing
Starting at $950,000

Verified 26 August 2026Miami-Dade County Property Appraiser, E11EVEN Residences Beyond Planned for NE 11th St, Miami, Foundation Pour Completed at E11EVEN Residences Beyond +1 more6 sources

Sources

1 / 1

Downtown Miami arena and skyline at night — the Park West district where E11EVEN Residences Beyond is rising

Building facts

Address
20 NE 11th Street
Neighborhood
Downtown Miami
Year built
Est. 2027
Floors
65
Residences
550
Status
Under construction — nearing topping out
Developer
PMG & E11EVEN Partners
Architect
Sieger Suarez Architects
Pricing
Starting at $950,000
E11even Residences Beyond Miami — image to follow
E11even Residences Beyond Miami — image to follow
Downtown Miami arena and skyline at night — the Park West district where E11EVEN Residences Beyond is rising

E11EVEN Residences Beyond — Building Facts

Address
60 NE 11th Street, Miami, FL 33132 — Park West, Downtown Miami
Status
Under construction — nearing topping out as of March 2026
Storeys
65 · approximately 700 feet
Residences
550 — revised up from “at least 380” announced in 2023
Residence sizes
Approximately 385–2,675 sq ft — studios to two-bedroom, plus a Presidential Collection
Foundation poured
August 2024
Progress, March 2026
Floor 62 decked, formwork at level 63, curtain wall to about level 57
Delivery target
2027 — reported as May 2027. ⚠️ Originally slated for 2025
Developer
Property Markets Group with E11EVEN Partners
Architect
Sieger Suarez Architects · interiors by AvroKO · contractor John Moriarty & Associates
Sister tower
E11EVEN Hotel & Residences — 456 homes, delivered June 2026
⚠️ Current pricing
No current price list has been published. See below

Key Takeaways

  • 🔴 This page had the wrong address, the wrong unit count and the wrong year until August 2026. It gave 20 NE 11th Street — that is the other tower, which is already finished. It gave 461 units against a reported 550. And it gave “Yr. Built 2025” for a building now targeting 2027.
  • The building grew by roughly 45% between announcement and construction. In April 2023 it was reported as “at least 380 residences” of 318–2,762 sq ft, studios to three-bedroom, from the mid-$400,000s, delivering 2025. It is now 550 residences of 385–2,675 sq ft, studios to two-bedroom plus a Presidential Collection, delivering 2027. More homes, no three-bedrooms, two years later.
  • Structurally it is nearly done. As of 18 March 2026 floor 62 was decked with formwork up at level 63, and glass had reached roughly level 57. On a 65-storey tower that is the last few floors of concrete.
  • 🔴 No current price has been published anywhere I can find. The only figure in the trade record is the mid-$400,000s from April 2023, which is three years stale and predates a 45% increase in unit count. This page previously advertised “from $950,000” with no source. I searched The Real Deal, Florida YIMBY and PROFILEmiami and found no current price list; I am publishing that absence rather than a number.
  • ⚠️ The reported address has moved. Florida YIMBY has published this tower at “60th NE 11th St” (2023), 90 NE 11th Street (2025) and 60 NE 11th Street (2026). The county records the block as an assemblage of parcels at 20, 50, 60 and 90 NE 11th Street, which is why. The most recent primary says 60.
  • 🔴 The county has no residential record for this project at all. On 26 August 2026 every parcel on the block was still classified Vacant Land — Commercial with no condominium declaration. There are no folios, no assessed values and no comparables here — and there will not be until well after delivery.

E11even Residences Beyond Miami, by the numbers

65Storeys
461Residences
2026Year
Pre-ConstructionStatus

Developer: PMG & E11EVEN Partners · Architect: Sieger Suarez Architects · Starting at $950,000. Source: the building record on this site.

What is being built

E11EVEN Residences Beyond is the second and larger of two club-branded towers rising on one block of Park West in Downtown Miami. It is 65 storeys and roughly 700 feet, holding 550 residences — studios through two-bedroom homes from about 385 to 2,675 square feet, topped by what the developer markets as a Presidential Collection.

Have a question about E11even Residences Beyond Miami? This page is built from the county record and the trade press, not a listing feed. If you want what has actually closed here, or an honest read on whether it suits you, ask me directly.

Call (305) 695-8257Email about E11even Residences Beyond Miami

It is being built by Property Markets Group with E11EVEN Partners, designed by Sieger Suarez Architects with interiors by AvroKO, and constructed by John Moriarty & Associates — the same team that delivered the first tower.

Reported amenities include a rooftop helipad, a residents-only social club, a restaurant, executive office suites, fitness facilities, two pool decks, and a social club branded The Clayton. The 2023 announcement also described a 20,000-square-foot resort deck on the 11th storey and a wellness and fitness level on the 14th, and a skybridge connecting the two towers.

⚠️ Some of that amenity list dates from 2023 and some from 2026, and the programme has demonstrably changed in between. Treat amenity descriptions as the developer’s marketed intent rather than as delivered fact until the building opens.

What changed between announcement and construction

This is the most useful thing on the page, because it is the part a brochure will not show you.

April 2023, as announced2026, as built
Residences“at least 380”550
Unit typesStudios to three-bedroomStudios to two-bedroom, plus Presidential Collection
Sizes318–2,762 sq ft385–2,675 sq ft
Starting priceMid-$400,000sNot published
Delivery20252027
Storeys6565

So: the same height now holds about 45% more homes, the largest layouts were dropped, the smallest ones got slightly bigger, and delivery moved out two years. None of that is unusual for a Miami tower between announcement and topping out, and none of it is a criticism. But it is exactly the kind of change that leaves stale numbers scattered across the internet — including, until today, on this page.

I want to be careful about what this does and does not tell you. It does not tell you anything about the project’s health; the tower is 62 floors out of the ground and its sister building delivered on the same block two months ago. What it tells you is that any figure you read about this building needs a date attached to it, and that a three-bedroom you may have been shown in 2023 does not appear in the current programme.

Where construction actually stands

DateMilestoneSource
April 2023Announced — 65 storeys, at least 380 residences, delivery slated 2025Florida YIMBY, 21 April 2023
August 2024Foundation pour completedPROFILEmiami, 30 August 2024
March 2025Formwork at roughly the 13th floor; curtain wall begun on lower levelsFlorida YIMBY, March 2025
March 2026Floor 62 decked, formwork at level 63, curtain wall to about level 57Florida YIMBY, 18 March 2026
2027Delivery target, reported as May 2027The Real Deal, 22 June 2026

Read the 2025-to-2026 line carefully: the structure went from roughly floor 13 to floor 62 in twelve months. That is a fast, uninterrupted concrete pour, and combined with glass already at level 57 it is a strong indication the 2027 target is realistic rather than aspirational. The comparable evidence is on the same block — the first tower topped off in February 2025 and delivered in June 2026, about sixteen months later. Applying that gap here would put delivery in mid-2027, which is what the developer is saying.

What it costs — and why this page will not tell you

🔴 I could not find a current published price for this building, and I am not going to invent one.

The only figure in the trade record is “the mid-$400,000s”, reported by Florida YIMBY in April 2023. That predates the increase from roughly 380 to 550 homes and a two-year change in delivery, so I would not quote it as current and neither should anyone else.

This page previously advertised “Prices starting at $950,000”. I could not source that figure to anything, and it has been removed rather than left standing.

What I searched: The Real Deal, Florida YIMBY and PROFILEmiami, for any current price list, price range or sell-through percentage for E11EVEN Residences Beyond. I found none. One caveat I will state rather than hide — the South Florida Business Journal blocks our requests, so that outlet is unchecked rather than clear.

⚠️ The absence of a published sell-through figure is worth naming, not interpreting. Percentage-sold numbers reach the trade press because they flatter a project. For the first tower, the developer’s 90%-in-two-months presale figure was widely reported. For Beyond, no equivalent number has been published that I can find. I am not going to draw a conclusion from that — I am telling you what is and is not on the record so that you ask the sales office directly, and ask them to put the answer in writing.

The county holds nothing on this building

I pulled the Miami-Dade County Property Appraiser record for this block on 26 August 2026. The site is five parcels under the plat City of Miami North, Block 18, zoned Urban Core 60 Storey, at 20, 50, 60 and 90 NE 11th Street. Every one is classified “Vacant Land — Commercial”, with no year built and no building area. No E11EVEN condominium declaration appears in the county address index.

The parcel most closely associated with this tower, at 60 NE 11th Street, is a 6,250-square-foot lot assessed at $2,681,250 for 2026; the adjoining parcel at 90 NE 11th Street is 11,116 square feet, assessed at $4,768,764, and last transferred at $26,859,000 in May 2023 in a deed the county flags as between affiliated parties rather than arm’s-length.

For a building two years from delivery this is entirely normal. The point of saying it is this: there is no county price evidence for this project, and there will not be until well after closings begin. Not for the units, not for the building. If someone offers you a comparable here, ask where it came from.

What to check before you sign

Confirm which tower your contract is for. Two 65-storey E11EVEN towers of nearly identical height stand on the same block, one finished and one not, and published addresses for this one have varied between 60 and 90 NE 11th Street. The folio and legal description in your contract are what count.

Get the current price and availability in writing, with a date on it. Nothing current is published. Whatever you are quoted, have it dated and confirm what it includes.

Ask what happened to the three-bedrooms. They were in the 2023 programme and are not in the current one. If you are being shown a large layout, confirm it exists in the recorded plans.

⚠️ Do not assume short-term rental is permitted because of the branding. A club-branded tower invites that assumption. What actually governs is Florida’s state preemption, the City of Miami’s zoning and certificate-of-use position, and the condominium’s own declaration, which binds you personally — and which does not exist yet for this building. Get all three in writing before your rental plan becomes part of your purchase decision.

Read the deposit schedule and what happens if delivery moves again. This building has already moved from 2025 to 2027. That is ordinary, and it is also exactly why the contract’s outside date and deposit terms matter.

Who this suits

It suits a buyer who wants the E11EVEN concept and missed the first tower. Phase 1 was 90% reserved within two months of its 2021 launch and has now closed roughly 400 homes. This is the only way into the project at developer level.

It suits someone comfortable buying with two years to run. The structure is nearly topped out and the sister tower has delivered on the same block, which is about as much construction reassurance as pre-construction offers.

It suits a smaller-format buyer. With homes starting near 385 square feet and no three-bedrooms in the current programme, this is a studio-and-one-bedroom building with a luxury cap on top.

It does not suit anyone who needs a large home, and it does not suit a buyer who wants price certainty today, because no current price is published.

It does not suit someone relying on short-term rental income until they have the declaration and the City’s position in writing. That is not a comment on this building specifically — it is the rule everywhere, and branding makes people forget it here more than most.

And a note for buyers in the first tower. Five hundred and fifty more homes are arriving on your block in 2027, from the same developer, with a sales team and no resale competition. If you are thinking about selling, the timing of that supply is a real factor.

E11EVEN Residences Beyond — Frequently Asked Questions

What is the address of E11EVEN Residences Beyond?

Most recently reported as 60 NE 11th Street, Miami, FL 33132, in Park West. ⚠️ Florida YIMBY has also published it as “60th NE 11th St” (2023) and 90 NE 11th Street (2025). The county records the site as an assemblage of parcels at 20, 50, 60 and 90 NE 11th Street, which is why the reported address varies. It is not 20 NE 11th Street — that is the first tower, already delivered.

How many units does it have?

550 residences over 65 storeys, approximately 385 to 2,675 square feet, studios to two-bedroom plus a Presidential Collection. ⚠️ A figure of 461 appeared on this page until August 2026 and is wrong; the 2023 announcement said “at least 380”, so the building grew roughly 45% between announcement and construction.

When will it be finished?

2027, reported as May 2027. ⚠️ It was originally slated for 2025. As of 18 March 2026 floor 62 was decked with formwork at level 63 and curtain wall to about level 57 — so the structure is within a few floors of topping out.

How much do units cost?

No current price has been published. The only figure in the trade record is “the mid-$400,000s” from Florida YIMBY in April 2023, which predates a 45% increase in unit count and a two-year change in delivery. This page previously showed “from $950,000”; that was unsourced and has been removed. Ask the sales office for a dated price list in writing.

How much of it has sold?

No sell-through figure has been published for this tower in The Real Deal, Florida YIMBY or PROFILEmiami. By contrast the first tower’s 90%-in-two-months presale figure was widely reported. I am stating that absence rather than drawing a conclusion from it. The South Florida Business Journal blocks our requests and was not searched.

Is this the same building as E11EVEN Hotel & Residences?

No. They are two separate towers on the same Park West block, connected by a skybridge in the announced plans. E11EVEN Hotel & Residences at 20 NE 11th Street holds about 456 homes and delivered in June 2026. Beyond holds 550 and is targeting 2027. Together, 1,006 residences.

Are there county sale records for this building?

None. On 26 August 2026 all five parcels on the block were still classified Vacant Land — Commercial with no condominium declaration recorded in the county address index. There are no folios, no assessed values and no county-verified comparables, and there will not be until well after closings begin.

Sources and further reading

Considering E11EVEN Residences Beyond?

No current price list has been published and the county holds nothing on this building yet — which means everything depends on what the sales office will put in writing. Let me help you ask the right questions before you sign.

ASK JOSH ABOUT E11EVEN BEYOND

Thinking about E11even Residences Beyond Miami?

I have sold South Florida property since 2002, more than $1 billion of it. Ask me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.

Call (305) 695-8257Send me a question

Josh Stein · Florida real estate sales associate, license SL3057661 · (305) 695-8257 · hello@joshsteinrealtor.com
Ask me about E11even Residences Beyond Miami20 NE 11th StreetWhatsAppContact

Related coverage

Part of South Florida New Construction.

Direct line

Ask Josh a question

Tell me the building, the budget and the timeline. You will get an honest read — including when the answer is that you should not buy it.

+1 (305) 695-8257 · hello@joshsteinrealtor.comPhone or WhatsApp · English / Español · Licensed in Florida since 2002

The Miami Confidential

The reporting, every two weeks.

Every new case file. Every delivery date that moves. Every figure dated and sourced. No listings, no hype, no press releases dressed up as news.