Miami Real EstateThe MIAMI
Confidential
Case files · 21 September 2026
Latest File · Brickell & Brickell KeyBrickell unit counts: three towers, published figures comparedThis file needs no developer’s cooperation and makes no accusation. It is three towers, three sets of numbers …Open the files →
Josh Stein, Miami real estate associateJosh Stein
Josh Stein Realtor — photography coming soon

NoBe PARC Miami Beach

1 / 1

NoBe PARC Miami Beach — photography to follow

Building facts

Address
7140 Abbott Avenue
Neighborhood
North Beach
Year built
Est. 2028
Floors
15
Residences
232
Status
Planned — completion targeted Q4 2028

Key Takeaways

  • 232 residences across 15 floors — at 7140 Abbott Avenue.
  • Status: Planned — completion targeted Q4 2028 — verified against the county roll and the development trade record.
  • Year built: Est. 2028.
  • Neighbourhood: North Beach.

What is planned at NoBe PARC Miami Beach?

NoBe PARC is a 15-storey building of 232 residences planned for 7140 Abbott Avenue in North Beach, with completion targeted for the fourth quarter of 2028.

Have a question about NoBe PARC Miami Beach? This page is built from the county record and the trade press, not a listing feed. If you want what has actually closed here, or an honest read on whether it suits you, ask me directly.

Call (305) 695-8257Email about NoBe PARC Miami Beach

The amenity plan is split across two decks

A fifth-floor deck carries a resort-style pool, a cold plunge and steam and sauna rooms; the roof carries a sunset lounge, a yoga space and private cabanas. Below those sit a beach-club programme, a fitness centre, outdoor kitchens, gaming lawns, a children’s playroom, coworking space and ground-floor commercial.

North Beach is the point

The site sits walking distance from the ocean, the Miami Beach Bandshell and the Miami Beach Tennis Center. North Beach has absorbed several new mid-rise projects in this cycle at prices well under South Beach — this is one of the larger ones.

NoBe PARC Miami Beach — questions buyers ask

What stage is NoBe PARC at?

Planned. Completion is targeted for the fourth quarter of 2028; construction has not been reported as started.

How many residences will NoBe PARC have?

232, across 15 storeys at 7140 Abbott Avenue in North Beach.

What is in the building besides residences?

A beach-club programme, a fitness centre, outdoor kitchens, gaming lawns, a children’s playroom, coworking space and ground-floor commercial.

Why North Beach rather than South Beach?

The site is walking distance from the ocean, the Miami Beach Bandshell and the Miami Beach Tennis Center. North Beach has absorbed several new mid-rise projects in this cycle at prices well under South Beach, and this is one of the larger ones.

Thinking about NoBe PARC Miami Beach?

I have sold South Florida property since 2002, more than $1 billion of it. Ask me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.

Call (305) 695-8257Send me a question

Josh Stein · Florida real estate sales associate, license SL3057661 · (305) 695-8257 · hello@joshsteinrealtor.com
Ask me about NoBe PARC Miami BeachWhatsAppContact

Related coverage

Part of South Florida New Construction.

Get this building’s public record before you put down a deposit

  • Its permits, approvals and construction status as they appear in city and county filings, each with its filing date.
  • An alert when the status changes, and when the first closed sales in the building are recorded.
  • No sales pitch, no inventory blasts. One building, and only what the public record shows.

Get the building record

Tell Josh which building. He’ll send what the filings show and let you know when it changes.

Direct line

Ask Josh a question

Tell me the building, the budget and the timeline. You will get an honest read — including when the answer is that you should not buy it.

+1 (305) 695-8257 · hello@joshsteinrealtor.comPhone or WhatsApp · English / Español · Licensed in Florida since 2002

The Miami Confidential

The reporting, every two weeks.

Every new case file. Every delivery date that moves. Every figure dated and sourced. No listings, no hype, no press releases dressed up as news.

Free, every two weeks. Pick one or both. Unsubscribe in one click.
A–Z Buildings
Scroll to Top