South Florida New Construction · Mr. C Hotel & Residences West Palm Beach
146 branded residences plus 110 hotel suites, in a 27-story tower.
By Josh Stein · Florida license SL3057661 · Updated 8 October 2026Leer en español →
Listings are updating. Please check again in a minute. Search all homes
Verified 24 September 2026Florida YIMBY, PROFILEmiami, The Real Deal +16 more19 sources
Mr. C Residences, West Palm Beach — upward exterior view of the tower corner with palm trees, developer rendering
Mr. C Residences, West Palm Beach — residence lobby with seating and reception desk, developer rendering
Mr. C Residences, West Palm Beach — residence kitchen with ocean view, developer rendering
Mr. C Residences, West Palm Beach — residence bedroom interior, developer rendering
Mr. C Residences, West Palm Beach — amenities-deck pool with cabanas at dusk, developer rendering
Mr. C Residences, West Palm Beach — resident lounge corridor interior, developer rendering
Building facts
- Address
- 320 Lakeview Avenue (the county lists the parcel as 383 Okeechobee Blvd)
- Neighborhood
- Downtown West Palm Beach
- Completion
- Slated for 2027 (PROFILEmiami, 7 Jul 2026)
- Floors
- 27
- Residences
- 146 branded residences, plus 110 hotel suites
- Status
- Under construction — superstructure at about the 16th floor (Florida YIMBY, 3 Aug 2026)
- Developer
- Terra · Sympatico Real Estate
- Architect
- Arquitectonica
- Pricing, as of 24 Sep 2026
- From $1.7 million



Key Takeaways
- 146 branded residences plus 110 hotel suites, in a 27-story tower — at 320 Lakeview Avenue in downtown West Palm Beach (developer’s fact sheet; Florida YIMBY, 3 August 2026). The county lists the parcel as 383 Okeechobee Boulevard and the fact sheet says 327 Okeechobee Boulevard; see “What the county record shows” below.
- Status: under construction — Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor. Ground was broken in August 2025 with a $285 million construction loan from Tyko Capital (PROFILEmiami and The Real Deal, 21 August 2025), and PROFILEmiami reported on 7 July 2026 that more than 85% was sold. The county record cannot confirm any of this: its 2026 preliminary roll still carries the site as one parcel of vacant commercial land with no improvements and no units.
- Developed by Terra and Sympatico Real Estate, with the Mr. C brand founded by the Cipriani family. The developer’s legal disclaimer names Lakeview Hospitality Investments, LLC as the developer — also the county’s owner of record for the land — and says the developer is separate from Mr. C, which is not responsible for the website’s content.
- Architecture by Arquitectonica, interiors by Meyer Davis and landscape by Landscape Design Workshop (developer’s website and fact sheet); KAST Construction is the general contractor (Florida YIMBY, 3 August 2026).
- Completion: slated for 2027 — PROFILEmiami reported 2027 on 7 March 2025 and 7 July 2026, and Florida YIMBY on 3 August 2026. Earlier reports gave 2026 (The Real Deal, 25 October 2023) and late 2026 (PROFILEmiami, 9 February 2024); I have not found a source that says why the date moved.
- Pricing: from $1.7 million — Douglas Elliman, the developer’s exclusive sales agent, shows “Priced from $1,700,000” on its building page (read 24 September 2026; the page carries no date). PROFILEmiami reported from $1.6 million on 7 March 2025 and from $1.5 million at the February 2024 sales launch. With more than 85% reported sold, ask the developer what is left and at what price.
- Bought pre-construction at Mr. C Hotel & Residences West Palm Beach? — before closing, a sale is usually an assignment of your purchase contract, and whether that is allowed depends on its assignment clause; after closing it is an ordinary resale. Ask Josh what your unit could sell for at delivery on WhatsApp.



What is being built at Mr. C Hotel & Residences West Palm Beach?
A 27-story mixed-use tower in downtown West Palm Beach carrying 146 branded residences and 110 hotel suites (developer’s fact sheet; Florida YIMBY, 3 August 2026). Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor, with early glazing appearing on lower floors and KAST Construction as general contractor. PROFILEmiami reported on 7 July 2026 that more than 85% of the residences were sold and that completion is slated for 2027. I have not found a report of a topping-off, or of construction progress, after 3 August 2026.
Have a question about Mr. C Hotel & Residences West Palm Beach? This page is built from the developer’s own materials, the trade press and the county record, not a listing feed. If you want what has actually closed here, or an honest read on whether it suits you, ask me directly.
Call (305) 695-8257Email about Mr. C Hotel & Residences West Palm Beach
Developed by Terra and Sympatico Real Estate, designed by Arquitectonica with interiors by Meyer Davis. The developer’s floor plans, read 24 September 2026, show residences from Level 2 (Residence 211: one bedroom, 1.5 bathrooms and den, 1,088 square feet interior and 1,375 with the balcony) up to Levels 16 to 20 (Residence 03: two bedrooms, 2.5 bathrooms, 1,698 square feet interior and 2,010 with the balcony). The developer says stated areas are measured to the exterior of the walls and differ from the declaration’s definition of a unit.
Renting a residence: read the offering documents, floor by floor
The Real Deal reported on 21 August 2025 that the 146 condos are ones owners can rent through the hotel program, and Robb Report reported in October 2023 that, depending on the floor, owners could enter their home in the hotel’s rental program. The 7 July 2026 announcement says the 146 branded residences include a collection of turnkey, move-in-ready resort residences. That is as far as the sources I read go. The developer’s website, fact sheet and the floor plans I read set out no rental rules, and I have not found the number of resort residences, which floors they are on, or any lease minimum, in those or in the trade press. Some third-party sales websites publish specific counts, floor ranges and lease terms; I cannot tie those to the developer, so I do not repeat them here.
The developer’s disclaimer says oral representations cannot be relied upon and points buyers to the documents required by section 718.503, Florida Statutes. Confirm which floors can join the rental program, and on what terms, in those offering documents and in the declaration of condominium.
Not the same building as Mr. C in Coconut Grove
The Cipriani family’s Mr. C brand also has Mr. C Residences at 2678 Tigertail Avenue in Coconut Grove, a 20-story, 230-unit project that Terra delivered in 2024 with Mr. C as brand partner (The Real Deal, 31 July 2024). Terra is a developer of both; the West Palm Beach project adds Sympatico Real Estate as a partner and 110 hotel suites in the same tower. Different city, different building.
What the county record shows
The Palm Beach County Property Appraiser carries the site as one parcel, 74-43-43-22-14-006-0080, with the site address 383 Okeechobee Boulevard, in Phillips Point Addition (Block F). Its legal description takes in rights-of-way along Lakeview Avenue, South Dixie Highway and Okeechobee Boulevard. The parcel is 1.32 acres, carries the county’s zoning code OBD-25 (“Okeechobee Business – 25”), and the owner of record is Lakeview Hospitality Investments LLC — the entity the developer’s legal disclaimer names as the developer (retrieved 24 September 2026). The address appears three ways in the sources I read: 320 Lakeview Avenue (The Real Deal, Florida YIMBY, Commercial Observer, PROFILEmiami, Robb Report), 327 Okeechobee Boulevard (the developer’s fact sheet) and 383 Okeechobee Boulevard (the county and Douglas Elliman’s building page). I have not found a source that says which is the address of record for the condominium.
The county still carries the parcel as vacant commercial land, with no building, no units and $0 of improvements on the 2026 preliminary roll (values are as of 1 January 2026). The land is valued at $13,308,057 for 2026 (preliminary), against $12,070,800 for 2025; the 2024 roll still carried $1,250,945 of improvements, before demolition began in November 2024 (Florida YIMBY, 7 November 2024). The sales table lists a $6,100,000 warranty deed dated 28 April 2021 (owner column: 320 Lakeview Avenue LLC) and a $10 warranty deed dated 5 May 2022 to Lakeview Hospitality Investments LLC. So the county cannot confirm the stories, the residence count, the hotel suites or how far construction has gone; those come from the developer and the trade press listed below.
Sources and further reading
- The Residences — Mr. C Residences West Palm Beach official developer website, read 24 September 2026 (27-story tower of 146 Private Residences; 10-foot ceilings; exclusive sales and marketing by Douglas Elliman Development Marketing; sales gallery at 401 S. Olive Avenue)mrcresidenceswpb.com
- The Team — official developer website, read 24 September 2026 (Arquitectonica architecture; Meyer Davis interior design; Landscape Design Workshop landscapes; Terra and Sympatico Real Estate as project visionaries; Mr. C founded by the Cipriani brothers)mrcresidenceswpb.com
- Legal Disclaimer — official developer website, read 24 September 2026 (developed by Lakeview Hospitality Investments, LLC; developer separate from Mr. C; oral representations cannot be relied upon; documents required by section 718.503, Florida Statutes; prices and plans subject to change)mrcresidenceswpb.com
- Features and amenities fact sheet (file named Aug24) — official developer website, read 24 September 2026 (27 story tower of 146 Private Residences and 110 hotel guest suites; project location 327 Okeechobee Boulevard; design team)mrcresidenceswpb.com
- Residence 211 floor plan (Level 2) — official developer website, read 24 September 2026 (one bedroom, 1.5 bathrooms and den; 1,088 sq ft interior, 287 balcony, 1,375 total)mrcresidenceswpb.com
- Residence 03 floor plan (Levels 16 to 20) — official developer website, read 24 September 2026 (two bedrooms, 2.5 bathrooms; 1,698 sq ft interior, 312 balcony, 2,010 total)mrcresidenceswpb.com
- Mr. C Residences, West Palm Beach — Douglas Elliman building page, read 24 September 2026 (undated; “Priced from $1,700,000”; 146 residences; 27 stories; 383 Okeechobee Boulevard; developer Terra)elliman.com
- Construction Progresses on 27-Story Mr. C Hotel & Residences West Palm Beach — Florida YIMBY, 3 August 2026 (superstructure at approximately the 16th floor; 110 hotel suites and 146 branded residences; KAST Construction; $285 million Tyko Capital loan; over 85% sold; completion 2027)floridayimby.com
- Mr. C Hotel & Residences West Palm Beach Passes 85% Sold — PROFILEmiami, 7 July 2026 (announcement quoting Terra’s CEO: more than 85% sold; slated for 2027 completion; 27 stories; 110 hotel suites and 146 branded residences including a collection of turnkey resort residences)profilemiamire.com
- Terra Secures $285 Million Construction Loan And Announces Groundbreaking For Mr. C Hotel & Residences West Palm Beach — PROFILEmiami, 21 August 2025 (TYKO Capital loan; broke ground at 70% sold; 110 hotel suites and 146 branded residences; Douglas Elliman exclusive sales)profilemiamire.com
- Tyko lends $285M to Terra, Sympatico for Mr. C West Palm Beach project — The Real Deal, 21 August 2025 (27-story building; 110 hotel keys; 146 branded condos owners can rent through the hotel program; 320 Lakeview Avenue; expected 2027; Terra completed Mr. C Residences in Coconut Grove in 2024)therealdeal.com
- Tyko Loans $285M to Build Mr. C Condo and Hotel in West Palm Beach — Commercial Observer, 21 August 2025 (110 hotel rooms and 146 condos at 320 Lakeview Avenue, adjacent to Okeechobee Boulevard; about 70 percent presold)commercialobserver.com
- Mr. C Hotel & Residences West Palm Beach Starts Construction At 65% Sold — PROFILEmiami, 7 March 2025 (65% sold; residences priced from $1.6 million; 830 to 2,200 sq ft; slated for completion in 2027)profilemiamire.com
- Demolition Commenced at Site of Mr. C Hotel & Residences West Palm Beach — Florida YIMBY, 7 November 2024 (1.3-acre site at 320 Lakeview Avenue, formerly including a BB&T bank branch; 27 stories; 110 hotel rooms and 146 branded condominiums)floridayimby.com
- David Martin’s Terra completes Mr. C Residences in Coconut Grove — The Real Deal, 31 July 2024 (20-story, 230-unit project at 2678 Tigertail Avenue delivered by Terra with Mr. C as partner)therealdeal.com
- Terra and Sympatico Real Estate Launch Sales For Mr. C Residences West Palm Beach — PROFILEmiami, 9 February 2024 (sales launch; 26-story; priced from $1.5 million; one to four bedrooms, 830 to 2,200 sq ft; completion expected late 2026)profilemiami.com
- Terra, Morrison family plan first Mr. C condo-hotel in downtown West Palm Beach — The Real Deal, 25 October 2023 (25-story plan; 146 condos owners can rent out through the hotel operator; from $2 million; completion expected 2026; 1.3-acre site including a former BB&T branch)therealdeal.com
- The Cipriani Brothers Are Building West Palm Beach’s First Hotel-Branded Residences — Robb Report, 26 October 2023 (25-story plan; 146 private residences from $2 million; hotel rental program depending on the floor; completion 2026)robbreport.com
- Property Details, parcel 74-43-43-22-14-006-0080 (383 Okeechobee Blvd) — Palm Beach County Property Appraiser, retrieved 24 September 2026 (vacant commercial land; 1.32 acres; zoning OBD-25; 0 units; owner of record Lakeview Hospitality Investments LLC; deeds of 28 April 2021 for $6,100,000 and 5 May 2022 for $10; 2026 preliminary market value $13,308,057)pbcpao.gov
Already bought at Mr. C Hotel & Residences West Palm Beach?
If you signed a pre-construction contract here, this part of the page is for you: what you can do with your contract, and how to get the record as it changes.
Your three options
- Close and keep it. Live in it, or rent it out within the condominium’s rental rules.
- Assign your contract before closing. A new buyer takes over your contract. Whether that is allowed, and at what fee, depends on your contract’s assignment clause and usually on the developer’s written consent.
- Close, then resell. After closing it is an ordinary resale, priced against what similar homes have actually recorded.
What I will send you
Tell me your unit. I will send you the project’s status from the public filings as it changes, the first recorded sales here when they land, and a straight read on whether to hold, assign or sell.
Two free things for buyers here
Prefer email? hello@joshsteinrealtor.com
Josh Stein, Florida real estate sales associate, license SL3057661.Mr. C Hotel & Residences West Palm Beach — questions buyers ask
I bought pre-construction at Mr. C Hotel & Residences West Palm Beach. Can I sell before or at delivery?
It depends on your purchase agreement. Before closing, selling usually means assigning your contract to a new buyer, which developers often allow only with their written consent and sometimes for a fee, so read the assignment clause first. After closing it is an ordinary resale, priced against what similar homes in the building and nearby have actually closed for. If you bought at Mr. C Hotel & Residences West Palm Beach and want to know what your unit could sell for at delivery, message Josh Stein on WhatsApp at (305) 695-8257.
How far along is construction?
Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor, with early glazing appearing on lower floors. PROFILEmiami reported on 7 July 2026 that the project was more than 85% sold. I have not found a report of a topping-off, or of progress, after 3 August 2026.
When will the tower be finished?
Completion is slated for 2027, according to PROFILEmiami (7 March 2025 and 7 July 2026) and Florida YIMBY (3 August 2026). Earlier reports gave 2026 (The Real Deal, 25 October 2023) and late 2026 (PROFILEmiami, 9 February 2024), and I have not found a source that says why the date moved.
How many residences and hotel suites are there, and what do they cost?
146 branded residences and 110 hotel suites in a 27-story mixed-use tower at 320 Lakeview Avenue (developer’s fact sheet; Florida YIMBY, 3 August 2026). Douglas Elliman, the developer’s exclusive sales agent, shows the residences as priced from $1,700,000 on its building page (read 24 September 2026; undated); PROFILEmiami reported from $1.6 million on 7 March 2025. With more than 85% reported sold, confirm what is left and at what price with the developer.
Can I rent my residence through the hotel?
The Real Deal reported on 21 August 2025 that the 146 condos are ones owners can rent through the hotel program, and Robb Report reported in October 2023 that eligibility depends on the floor. I have not found the floor-by-floor rules, or any lease minimum, in the developer’s website, fact sheet or floor plans that I read, or in the trade press, so confirm them in the offering documents and the declaration of condominium before you rely on them.
Is this the same as Mr. C in Coconut Grove?
No, but the same firm is behind both. The Cipriani family’s Mr. C brand also has Mr. C Residences at 2678 Tigertail Avenue in Coconut Grove, which Terra delivered in 2024 (The Real Deal, 31 July 2024). The West Palm Beach project adds Sympatico Real Estate as a partner and 110 hotel suites in the same tower.
Who is behind the building?
Terra and Sympatico Real Estate, with the Mr. C brand founded by the Cipriani family; architecture by Arquitectonica, interiors by Meyer Davis, landscape by Landscape Design Workshop, KAST Construction as general contractor (Florida YIMBY, 3 August 2026), and sales and marketing by Douglas Elliman Development Marketing. The developer’s legal disclaimer names Lakeview Hospitality Investments, LLC as the developer and says it is separate from Mr. C.
Thinking about Mr. C Hotel & Residences West Palm Beach?
I have sold South Florida property since 2002. Ask me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.
Josh Stein · Florida real estate sales associate, license SL3057661 · (305) 695-8257 · hello@joshsteinrealtor.comRelated coverage
Part of South Florida New Construction.

