Miami Real EstateThe MIAMI
Confidential
Case files · 11 November 2026
Latest File · Brickell & Brickell KeyFollowing a building in these files?Tell Josh which one. He’ll send its recorded sales from the Miami-Dade record, what is on the market there now …Open the files →
Josh Stein, Miami real estate associateJosh Stein
Mr. C Residences, West Palm Beach — upward exterior view of the tower corner with palm trees, developer rendering

Mr. C Hotel & Residences West Palm Beach

South Florida New Construction · Mr. C Hotel & Residences West Palm Beach

146 branded residences plus 110 hotel suites, in a 27-story tower.

By Josh Stein · Florida license SL3057661 · Updated 8 October 2026Leer en español →

Listings are updating. Please check again in a minute. Search all homes

Talk to a human

Want to know more?

Drop your details and we will get right back to you.

Verified 24 September 2026Florida YIMBY, PROFILEmiami, The Real Deal +16 more19 sources

Sources

1 / 6

Mr. C Residences, West Palm Beach — upward exterior view of the tower corner with palm trees, developer rendering

2 / 6

Mr. C Residences, West Palm Beach — residence lobby with seating and reception desk, developer rendering

3 / 6

Mr. C Residences, West Palm Beach — residence kitchen with ocean view, developer rendering

4 / 6

Mr. C Residences, West Palm Beach — residence bedroom interior, developer rendering

5 / 6

Mr. C Residences, West Palm Beach — amenities-deck pool with cabanas at dusk, developer rendering

6 / 6

Mr. C Residences, West Palm Beach — resident lounge corridor interior, developer rendering

Building facts

Address
320 Lakeview Avenue (the county lists the parcel as 383 Okeechobee Blvd)
Neighborhood
Downtown West Palm Beach
Completion
Slated for 2027 (PROFILEmiami, 7 Jul 2026)
Floors
27
Residences
146 branded residences, plus 110 hotel suites
Status
Under construction — superstructure at about the 16th floor (Florida YIMBY, 3 Aug 2026)
Developer
Terra · Sympatico Real Estate
Architect
Arquitectonica
Pricing, as of 24 Sep 2026
From $1.7 million
Mr. C Residences, West Palm Beach — upward exterior view of the tower corner with palm trees, developer rendering
upward exterior view of the tower corner with palm trees, developer rendering
Mr. C Residences, West Palm Beach — amenities-deck pool with cabanas at dusk, developer rendering
amenities-deck pool with cabanas at dusk, developer rendering
Mr. C Residences, West Palm Beach — residence lobby with seating and reception desk, developer rendering
residence lobby with seating and reception desk, developer rendering

Key Takeaways

  • 146 branded residences plus 110 hotel suites, in a 27-story tower — at 320 Lakeview Avenue in downtown West Palm Beach (developer’s fact sheet; Florida YIMBY, 3 August 2026). The county lists the parcel as 383 Okeechobee Boulevard and the fact sheet says 327 Okeechobee Boulevard; see “What the county record shows” below.
  • Status: under construction — Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor. Ground was broken in August 2025 with a $285 million construction loan from Tyko Capital (PROFILEmiami and The Real Deal, 21 August 2025), and PROFILEmiami reported on 7 July 2026 that more than 85% was sold. The county record cannot confirm any of this: its 2026 preliminary roll still carries the site as one parcel of vacant commercial land with no improvements and no units.
  • Developed by Terra and Sympatico Real Estate, with the Mr. C brand founded by the Cipriani family. The developer’s legal disclaimer names Lakeview Hospitality Investments, LLC as the developer — also the county’s owner of record for the land — and says the developer is separate from Mr. C, which is not responsible for the website’s content.
  • Architecture by Arquitectonica, interiors by Meyer Davis and landscape by Landscape Design Workshop (developer’s website and fact sheet); KAST Construction is the general contractor (Florida YIMBY, 3 August 2026).
  • Completion: slated for 2027 — PROFILEmiami reported 2027 on 7 March 2025 and 7 July 2026, and Florida YIMBY on 3 August 2026. Earlier reports gave 2026 (The Real Deal, 25 October 2023) and late 2026 (PROFILEmiami, 9 February 2024); I have not found a source that says why the date moved.
  • Pricing: from $1.7 million — Douglas Elliman, the developer’s exclusive sales agent, shows “Priced from $1,700,000” on its building page (read 24 September 2026; the page carries no date). PROFILEmiami reported from $1.6 million on 7 March 2025 and from $1.5 million at the February 2024 sales launch. With more than 85% reported sold, ask the developer what is left and at what price.
  • Bought pre-construction at Mr. C Hotel & Residences West Palm Beach? — before closing, a sale is usually an assignment of your purchase contract, and whether that is allowed depends on its assignment clause; after closing it is an ordinary resale. Ask Josh what your unit could sell for at delivery on WhatsApp.
Mr. C Residences, West Palm Beach — resident lounge corridor interior, developer rendering
resident lounge corridor interior, developer rendering
Mr. C Residences, West Palm Beach — residence kitchen with ocean view, developer rendering
residence kitchen with ocean view, developer rendering
Mr. C Residences, West Palm Beach — residence bedroom interior, developer rendering
residence bedroom interior, developer rendering

What is being built at Mr. C Hotel & Residences West Palm Beach?

A 27-story mixed-use tower in downtown West Palm Beach carrying 146 branded residences and 110 hotel suites (developer’s fact sheet; Florida YIMBY, 3 August 2026). Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor, with early glazing appearing on lower floors and KAST Construction as general contractor. PROFILEmiami reported on 7 July 2026 that more than 85% of the residences were sold and that completion is slated for 2027. I have not found a report of a topping-off, or of construction progress, after 3 August 2026.

Have a question about Mr. C Hotel & Residences West Palm Beach? This page is built from the developer’s own materials, the trade press and the county record, not a listing feed. If you want what has actually closed here, or an honest read on whether it suits you, ask me directly.

Call (305) 695-8257Email about Mr. C Hotel & Residences West Palm Beach

Developed by Terra and Sympatico Real Estate, designed by Arquitectonica with interiors by Meyer Davis. The developer’s floor plans, read 24 September 2026, show residences from Level 2 (Residence 211: one bedroom, 1.5 bathrooms and den, 1,088 square feet interior and 1,375 with the balcony) up to Levels 16 to 20 (Residence 03: two bedrooms, 2.5 bathrooms, 1,698 square feet interior and 2,010 with the balcony). The developer says stated areas are measured to the exterior of the walls and differ from the declaration’s definition of a unit.

Renting a residence: read the offering documents, floor by floor

The Real Deal reported on 21 August 2025 that the 146 condos are ones owners can rent through the hotel program, and Robb Report reported in October 2023 that, depending on the floor, owners could enter their home in the hotel’s rental program. The 7 July 2026 announcement says the 146 branded residences include a collection of turnkey, move-in-ready resort residences. That is as far as the sources I read go. The developer’s website, fact sheet and the floor plans I read set out no rental rules, and I have not found the number of resort residences, which floors they are on, or any lease minimum, in those or in the trade press. Some third-party sales websites publish specific counts, floor ranges and lease terms; I cannot tie those to the developer, so I do not repeat them here.

The developer’s disclaimer says oral representations cannot be relied upon and points buyers to the documents required by section 718.503, Florida Statutes. Confirm which floors can join the rental program, and on what terms, in those offering documents and in the declaration of condominium.

Not the same building as Mr. C in Coconut Grove

The Cipriani family’s Mr. C brand also has Mr. C Residences at 2678 Tigertail Avenue in Coconut Grove, a 20-story, 230-unit project that Terra delivered in 2024 with Mr. C as brand partner (The Real Deal, 31 July 2024). Terra is a developer of both; the West Palm Beach project adds Sympatico Real Estate as a partner and 110 hotel suites in the same tower. Different city, different building.

What the county record shows

The Palm Beach County Property Appraiser carries the site as one parcel, 74-43-43-22-14-006-0080, with the site address 383 Okeechobee Boulevard, in Phillips Point Addition (Block F). Its legal description takes in rights-of-way along Lakeview Avenue, South Dixie Highway and Okeechobee Boulevard. The parcel is 1.32 acres, carries the county’s zoning code OBD-25 (“Okeechobee Business – 25”), and the owner of record is Lakeview Hospitality Investments LLC — the entity the developer’s legal disclaimer names as the developer (retrieved 24 September 2026). The address appears three ways in the sources I read: 320 Lakeview Avenue (The Real Deal, Florida YIMBY, Commercial Observer, PROFILEmiami, Robb Report), 327 Okeechobee Boulevard (the developer’s fact sheet) and 383 Okeechobee Boulevard (the county and Douglas Elliman’s building page). I have not found a source that says which is the address of record for the condominium.

The county still carries the parcel as vacant commercial land, with no building, no units and $0 of improvements on the 2026 preliminary roll (values are as of 1 January 2026). The land is valued at $13,308,057 for 2026 (preliminary), against $12,070,800 for 2025; the 2024 roll still carried $1,250,945 of improvements, before demolition began in November 2024 (Florida YIMBY, 7 November 2024). The sales table lists a $6,100,000 warranty deed dated 28 April 2021 (owner column: 320 Lakeview Avenue LLC) and a $10 warranty deed dated 5 May 2022 to Lakeview Hospitality Investments LLC. So the county cannot confirm the stories, the residence count, the hotel suites or how far construction has gone; those come from the developer and the trade press listed below.

Sources and further reading

Already bought at Mr. C Hotel & Residences West Palm Beach?

If you signed a pre-construction contract here, this part of the page is for you: what you can do with your contract, and how to get the record as it changes.

Your three options

  1. Close and keep it. Live in it, or rent it out within the condominium’s rental rules.
  2. Assign your contract before closing. A new buyer takes over your contract. Whether that is allowed, and at what fee, depends on your contract’s assignment clause and usually on the developer’s written consent.
  3. Close, then resell. After closing it is an ordinary resale, priced against what similar homes have actually recorded.

What I will send you

Tell me your unit. I will send you the project’s status from the public filings as it changes, the first recorded sales here when they land, and a straight read on whether to hold, assign or sell.

WhatsApp Josh as an owner

Or send a message

Prefer email? hello@joshsteinrealtor.com

Josh Stein, Florida real estate sales associate, license SL3057661.

Mr. C Hotel & Residences West Palm Beach — questions buyers ask

I bought pre-construction at Mr. C Hotel & Residences West Palm Beach. Can I sell before or at delivery?

It depends on your purchase agreement. Before closing, selling usually means assigning your contract to a new buyer, which developers often allow only with their written consent and sometimes for a fee, so read the assignment clause first. After closing it is an ordinary resale, priced against what similar homes in the building and nearby have actually closed for. If you bought at Mr. C Hotel & Residences West Palm Beach and want to know what your unit could sell for at delivery, message Josh Stein on WhatsApp at (305) 695-8257.

How far along is construction?

Florida YIMBY reported on 3 August 2026 that the reinforced concrete superstructure had reached approximately the 16th floor, with early glazing appearing on lower floors. PROFILEmiami reported on 7 July 2026 that the project was more than 85% sold. I have not found a report of a topping-off, or of progress, after 3 August 2026.

When will the tower be finished?

Completion is slated for 2027, according to PROFILEmiami (7 March 2025 and 7 July 2026) and Florida YIMBY (3 August 2026). Earlier reports gave 2026 (The Real Deal, 25 October 2023) and late 2026 (PROFILEmiami, 9 February 2024), and I have not found a source that says why the date moved.

How many residences and hotel suites are there, and what do they cost?

146 branded residences and 110 hotel suites in a 27-story mixed-use tower at 320 Lakeview Avenue (developer’s fact sheet; Florida YIMBY, 3 August 2026). Douglas Elliman, the developer’s exclusive sales agent, shows the residences as priced from $1,700,000 on its building page (read 24 September 2026; undated); PROFILEmiami reported from $1.6 million on 7 March 2025. With more than 85% reported sold, confirm what is left and at what price with the developer.

Can I rent my residence through the hotel?

The Real Deal reported on 21 August 2025 that the 146 condos are ones owners can rent through the hotel program, and Robb Report reported in October 2023 that eligibility depends on the floor. I have not found the floor-by-floor rules, or any lease minimum, in the developer’s website, fact sheet or floor plans that I read, or in the trade press, so confirm them in the offering documents and the declaration of condominium before you rely on them.

Is this the same as Mr. C in Coconut Grove?

No, but the same firm is behind both. The Cipriani family’s Mr. C brand also has Mr. C Residences at 2678 Tigertail Avenue in Coconut Grove, which Terra delivered in 2024 (The Real Deal, 31 July 2024). The West Palm Beach project adds Sympatico Real Estate as a partner and 110 hotel suites in the same tower.

Who is behind the building?

Terra and Sympatico Real Estate, with the Mr. C brand founded by the Cipriani family; architecture by Arquitectonica, interiors by Meyer Davis, landscape by Landscape Design Workshop, KAST Construction as general contractor (Florida YIMBY, 3 August 2026), and sales and marketing by Douglas Elliman Development Marketing. The developer’s legal disclaimer names Lakeview Hospitality Investments, LLC as the developer and says it is separate from Mr. C.

Thinking about Mr. C Hotel & Residences West Palm Beach?

I have sold South Florida property since 2002. Ask me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.

Call (305) 695-8257Send me a question

Josh Stein · Florida real estate sales associate, license SL3057661 · (305) 695-8257 · hello@joshsteinrealtor.com
Ask me about Mr. C Hotel & Residences West Palm BeachWhatsAppContact

Related coverage

Part of South Florida New Construction.

Direct line

Ask Josh a question

Tell me the building, the budget and the timeline. You will get an honest read, including when the answer is that you should not buy it.

+1 (305) 695-8257 · hello@joshsteinrealtor.comPhone or WhatsApp · English / Español · Licensed in Florida since 2002

The Miami Confidential

The reporting, every two weeks.

Every new case file. Every delivery date that moves. Every figure dated and sourced. No listings, no hype, no press releases dressed up as news.

Free. Built from Miami-Dade County records. Subscribing means you agree to get it by email. Unsubscribe in one click.
A–Z Buildings
Scroll to Top