La Baia South — photography to follow
Building facts
- Address
- 9201 East Bay Harbor Drive
- Neighborhood
- Bay Harbor Islands
- Year built
- 2025
- Floors
- 8
- Residences
- 68
- Status
- Delivered — TCO Q4 2025, 100% sold
- Developer
- The Continuum Company
- Architect
- Luis Revuelta
Key Takeaways
- 68 residences across 8 floors — at 9201 East Bay Harbor Drive.
- Status: Delivered — TCO Q4 2025, 100% sold — verified against the county roll and the development trade record.
- Developed by The Continuum Company.
- Architecture by Luis Revuelta.
- Year built: 2025.
What was built at La Baia South?
La Baia South is an eight-storey waterfront building of 68 residences at 9201 East Bay Harbor Drive. It received its temporary certificate of occupancy in the fourth quarter of 2025 and sold out.
Have a question about La Baia South? This page is built from the county record and the trade press, not a listing feed. If you want what has actually closed here, or an honest read on whether it suits you, ask me directly.
Homes are one- to four-bedroom plans running 1,125 to 2,497 square feet, with two covered parking spaces per residence, Snaidero Italian cabinetry and Miele appliances. Standard residences carry 9-foot ceilings; penthouses carry 10.
The first of the pair
This is the completed tower. La Baia North broke ground in October 2024 for 2027. A sold-out first phase is the most useful signal available about how the second will price.
La Baia South — questions buyers ask
Is La Baia South finished?
Yes. It received its temporary certificate of occupancy in the fourth quarter of 2025 and sold out.
How many residences does La Baia South have?
68, across eight storeys at 9201 East Bay Harbor Drive. Standard residences carry 9-foot ceilings; penthouses carry 10.
Is anything available at La Baia South?
It sold out at delivery, so anything available now is a resale. Ask me what has actually closed there rather than working from a listing feed.
How does it relate to La Baia North?
They are a pair, sharing a developer, an architect and a specification. South is the completed first tower; North broke ground in October 2024 for 2027. A sold-out first phase is the most useful signal available about how the second will price.
Thinking about La Baia South?
I have sold South Florida property since 2002, more than $1 billion of it. Ask me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.
Josh Stein · Florida real estate sales associate, license SL3057661 · (305) 695-8257 · hello@joshsteinrealtor.comRelated coverage
Part of South Florida New Construction.
Get this building’s next recorded sale — before the listing sites catch up
- Every closed sale we can verify from the Miami-Dade record — price, date, and $/sqft when the deed supports it — not an IDX feed.
- Optional alert when a new deed posts in this building (or a short list of comps you choose).
- No spam inventory blasts. One building. One record. You decide what happens next.
Tell Josh which building. He’ll send the latest closed sales and set a quiet alert.

